CUSTOMER

Termo Yapı

LOCATION

Shymkent / Kazakhstan - 62.800 m2

START DATE

2004 – 2005

DURATION

PROJECT SCOPE

Electrical and electronic systems of 56 different structures in the production facility; creation of detail projects, implementation of projects and partial material supply. Within the scope of external service systems; 2 x 34.5 kV HV download areas and a total of 6km of 10kV MV underground cable ring, 12 pack type transformers each containing medium voltage distribution and protection cells, 2 x 10kV/0.4 transformers, low voltage panels and compensation. center , 7 pcs. With 1250kVA prime generator and 7 pcs.10kV step-up transformer, 5 pcs. 50 ton underground fuel tanks, fuel distribution pipes and automation. grounding systems and low voltage cables and infrastructures feeding the buildings from these substations, fiber network and infrastructure between buildings.

Project Images

AIN NAADJA HOTEL PROJECT – (ALGERIA)

PREV

Freedom Square Hotel – (Georgia/Tbilisi)

NEXT